Skip To Main Content

Fielding the Future

The Feltman and Barr family's contribution to the Build for the Future campaign is a tribute to the program that helped shape Aiden '25—and a bridge to the future for other students who will one day find their own strength, friendships, and sense of purpose through athletics at CCES. To read the full story, click on the photo below.

A crane lifts a steel beam with an American flag and a small tree attached, over a partially constructed building with a cherry picker in the foreground.

We celebrated a major construction milestone on Tuesday, July 7, in our Build for the Future campus expansion: The placement of the final structural beam, signaling the building’s framework is complete. 

We celebrated a major construction milestone on Tuesday, July 7, in our Build for the Future campus expansion. This “topping out” celebration marks the completion of the building’s framework with the placement of the final structural beam. 

This milestone celebrates the hard work of our construction partners and provides another visible symbol of our transformational process. It serves as the embodiment of the CCES commitment to continuous improvement, reflects our dedication to programmatic elevation, and further solidifies our position as leaders in innovative education in Greenville and beyond.

In addition to a redesigned campus loop road, the project scope adds two new facilities to the campus footprint. 

TIDE Building
A 22,000-square-foot TIDE (Technology, Innovation, Design and Entrepreneurship) building will connect to the existing Upper School through an elevated bridge and will include:

  • Five classrooms, two TIDE learning labs, one outdoor learning space, and multiple breakout rooms;
  • Collaboration rooms where technology, design, and business innovation intersect;
  • Flexible spaces that accommodate small and large group gatherings and promote immersive, hands-on learning experiences;
  • Monumental Learning Stair for class meetings, presentations and guest lectures;
  • Gallery space to display student designs and projects;
  • Central conference room that can serve as a primary meeting hub;
  • Grab & Go Cafe offering additional lunch and snack options.

The building will be a launching spot for our TIDE curriculum and programming, which is actively being developed and refined in partnership with the The Hill Institute for Innovation and Entrepreneurship at Furman University.

In support of TIDE programming, the Edward E. Ford Foundation awarded CCES a grant to bring in five or more professional experts-in-residence in the 2027-28 and 2028-29 academic years. Dedicated TIDE spaces and programming will continue to provide a platform for CCES students to engage with innovators across the country, developing skills and mindsets that prepare them for a dynamic future.

Sports Performance Center
In addition to a new Lacrosse and Field Hockey Field, the 59,500-square-foot sports performance facility will include:

  • 18,000-square-foot double court gymnasium;
  • Competition Arena with seating for 1,200;
  • 4,500-square-foot strength and conditioning space;
  • 3,500-square-foot dedicated cheer and wrestling space;
  • 1,500-square-foot athletic training room with dedicated treatment, rehabilitation, and hydrotherapy spaces;
  • 10 new modern locker rooms and bathrooms;
  • Elevated indoor track.

CCES is consistently voted as the top school in South Carolina for high school athletes, and this building will provide an even greater opportunity to support and showcase the hard work and talent of our student athletes. These spaces will also provide greater opportunities for athletic outreach programs and community partnerships. 
 

Read More about Topping Out: The Final Beam is in Place

Lacrosse has allowed me the opportunity to meet the most tremendous families, coach alongside the best coaches, and develop and hopefully inspire the next generation of female leaders. It has always been important for me to prioritize building relationships and teaching life lessons through the game of lacrosse.”molly miller Director of Athletics
Former Head Varsity Girls Lacrosse Coach

Honoring the Past and Celebrating the Present

While the existing competition field honors the memory of beloved field hockey coach Linda Reeves, signage at the new field will pay tribute to Linda's impact on CCES, while also recognizing the donors whose philanthropy brings the new field to fruition.

1.5M

THE ESTIMATED COST TO CONSTRUCT THE NEW DEDICATED LACROSSE AND FIELD HOCKEY ATHLETIC FIELD

56M

THE TOTAL CONSTRUCTION COST OF THE BUILD FOR THE FUTURE CAMPUS MASTER PLAN

2027

THE YEAR THE NEW FIELD IS EXPECTED TO BE COMPLETED AND READY FOR USE

The most special aspect of the CCES lacrosse experience for me is the relationships that I've created with players and families. I feel so supported and encouraged by our parents, players, faculty, and staff. Playing a role in the life middle and high school students is a privilege. Getting to see and interact with them every day at school is a true joy in my life. Coaching the sport I love in the best school community in the Upstate is such a gift.”joey porchettaAssistant Director of Athletics
Head Varsity Boys Lacrosse Coach

CCES-_LacrosseField01.jpg